10/25/13

How to Break Your Election Promises



Taxman: I was thinking of this Beatles’ song, recently, after council received the pre-budget report from the treasurer at last Monday’s council meeting. It’s dated, the song that is, but still eerily appropriate (I will have to learn to play it on my ukulele).

Last election, all of us who got elected ran on a platform of keeping costs and taxes low. Okay, that’s a fairly blithe promise; few candidates run on a platform of raising taxes and expenses, and fewer actually ever win a seat in any level of government.

It doesn’t matter if everyone knows taxes will go up after the election, or if there are seriously pressing needs to raise taxes. You don’t run on that platform.  Unless, of course, it’s to tax the rich – that seems a rather popular theme these days. Except, of course, among the rich. The 99% of us kind of like the idea… but I digress

This council has consistently attempted to cut costs, rein in spending and keep taxes low. That’s never easy, and often it’s very challenging, but we’ve managed to do so fairly well. In fact, the most recent auditor’s report (an independent audit) showed we have done it very well, in the past three budgets. The deputy mayor has cracked the whip and staff have pulled the oars. So far, the local ship of state has rowed in unison, avoiding the shoals of debt and taxation.

But it’s difficult to maintain a flat tax line. The world doesn’t work that way. Economies are always on the move.

Prices go up, costs go up, fee go up, old things need maintenance or replacement, new things need to be bought, collective agreements have built-in increases. Keeping a zero-percent increase is like the Red Queen’s race in Alice in Wonderland: you run as fast as you can just to stay in the same place:

Well, in our country,” said Alice, still panting a little, “you’d generally get to somewhere else — if you run very fast for a long time, as we’ve been doing.”
“A slow sort of country!” said the Queen. “Now, here, you see, it takes all the running you can do, to keep in the same place. If you want to get somewhere else, you must run at least twice as fast as that!”

We don’t have the money or the tax base to run twice as fast. But at some point, we have to have some increases if nothing more than to play catch-up with out expenses.

Continue reading

07/9/13

Centennial Pool Gets Finishing Touches


A sneak peak into Centennial Pool a few weeks before it re-opens. Councillor Lloyd and I took a look around today (July 9) at how it’s progressing. We were very impressed. It’s going to be fabulous! Collingwood residents will love this place. It is really a stunning facility and we will be proud to host events here.
Centennial Pool inside

The first image, at the top, shows the therapeutic pool at the bottom, with the ramp for accessibility, then the pool and the new electronic scoreboard. Feels like a cathedral inside, it’s so large! And light galore: bright and open. Warm, welcoming place. You can see some of the daylight panels in the fabric, on the left, above the daylight doors. The white stripe that runs between the panels and the doors is part of the HVAC system.

Centennial Pool inside

In this view, you can see the large therapeutic pool and the doors on the west. these can be opened up to let the sunlight and fresh air in on nice days. The material around both pools is rubberized, non-slip material. The construction equipment and tools won’t, of course, be part of the finished facility.
Continue reading

01/26/13

More construction at Centennial Pool


Centennial Pool building, Jan. 25
Here you can see the additional aluminum supports that have been erected to hold up the fabric covering. Only a small area at the north has had some of the fabric installed (visible at the lower left of the photo).
Centennial Pool building, Jan. 25
Workers were doing some maintenance jobs, Saturday. You can see how tall the centre of the building is. It will feel spacious and airy, inside.
Centennial Pool building, Jan. 25
Checking the struts and supports. Nice to see the company working on a weekend.
Centennial Pool building, Jan. 25
This gives you an idea how big and roomy the final building will be. A view from the intersection at Spruce and Third Streets.
Centennial Pool building, Jan. 25
All 14 of the main support struts have now been erected. Looking good!