A Sneak Peak Inside Our New Fire Hall

Loading

Councillor Lloyd and I took a tour through the new fire hall, at the corner of High and Third Streets, today. It’s still under construction, but the main components are finished and the firefighters have moved in. It’s an impressive place. Well-designed, well-built (using a lot of local builders and materials!). Make sure you attend the open house when the building is officially completed, this fall. … (more–>)

Centennial Pool Gets Finishing Touches

Loading

A sneak peak into Centennial Pool a few weeks before it re-opens. Councillor Lloyd and I took a look around today (July 9) at how it’s progressing. We were very impressed. It’s going to be fabulous! Collingwood residents will love this place. It is really a stunning facility and we will be proud to host events here. The first image, at the top, shows the therapeutic … (more–>)

More construction at Centennial Pool

Loading

Here you can see the additional aluminum supports that have been erected to hold up the fabric covering. Only a small area at the north has had some of the fabric installed (visible at the lower left of the photo). Workers were doing some maintenance jobs, Saturday. You can see how tall the centre of the building is. It will feel spacious and airy, inside. Checking … (more–>)

Back to Top